ATA-012 / Lotos Refinery Project

Gdansk / Poland

  • Date:Oct-2023 / June-2025
  • Customer: Berksan Mühendislik
  • Owner: Kinectics Technology S.p.A.

Details

  • Installation of 2 sets of Furnaces, 
  • 240 tons of structure, 
  • 75 tons of modules, 
  • 23 tons of coil, 
  • 32 m3 of refractory installation, 
  • 180 m3 of insulation installation 
  • Stack, Blower etc. 
  • Installation of 26 sets of pumps, alignment and pre-commissioning, 
  • Reactor and Vertical column 52 tons of SS internal tray installation, 
  • Execution of piping works, 
  • 51.052” CS welding, 
  • 1.742” SS welding, 
  • 1450” P11 welding, 
  • 1293” P9 welding, 
  • 204” P22 welding, 
  • 68” INC welding, 
  • 1.639” GS Threaded works, 
  • 97 Tons on piping supports, 
  • Valves, inline instruments, fire system equipment’s. 
  • 36000 meters of Steam Tracing installation. 
  • 6200 sqm painting application.