ATA-003 / LİKİTGAZ AYDIN – EFELER FACILITIES, Fire System Modernization Project
AYDIN / TURKEY
- Date: Apr-2021 / Ongoing
- Customer: LİKİTGAZ
Details
- Provision of whole project materials such as
- Concrete, re-bar, Anchors
- Field erected tanks annular and roof plates and accessories,
- Fire Pump building structural steel and cladding,
- CS and GS Pipes, fittings, and accessories,
- HDPE pipes, fittings, adaptors etc.
- Fire Protection devices like deluge valves, hydrants, safety showers, hose reels, sprinklers,
- Electrical supply such as Boards, cables, lighting and earthing materials,
- Civil work scope,
- Jet Grout works for a fire water tank and fire pump building.
- Excavation and backfilling works.
- Preparation of tank, building and pipe support foundations.
- Installation of Structural steel.
- Mechanical installation scope,
- 900 m3 field erected tank installation with accessories,
- Electrical and diesel fire pumps installation with fuel tanks.
- Above ground CS & GS, underground HDPE piping installation,
- Electrical installation scope
- Earthing system installation
- Power cable pulling, termination,
- Lighting systems.
- Testing and Commissioning of system